What date was it registered? I think it wasn't on the Wiltshire Website until the last week of March 2017 but the document claims to have been Registered on 23rd January 2017
And it appears on the Weekly List for 23rd January
But the search function on the Wiltshire website says it was registered on 23rd March
And the Document properties also show 23rd March
And the MOD were sent the documents on the 23rd of March as well
Which ties in better with the consultation period.
But English Heritage are asking for a year's grace prior to opening the path by the 1st October 2017 - so why the delay in asking for permission?
Tuesday, 28 March 2017
Monday, 27 March 2017
A344 Permissive Path Planning Application
STONEHENGE ENVIRONMENTAL IMPROVEMENTS PROJECT
Variation of Condition Application
The application seeks approval to vary condition 27 of planning permission S/2009/1527/FULL (dated 23/06/10) for the decommissioning of existing visitor facilities and a section of the A344; the erection of a new visitor centre, car park, coach park and ancillary services building and related highways and landscaping works.
The variation of condition 27 is to allow to allow a further year for the proposed permissive path to establish itself on the grassed over section of the former A344 near Stonehenge prior to it being open to the public as a pedestrian and cycle route by 1" October 2017.
See http://www.sarsen.org/2017/03/english-heritage-plans-to-block.html for more details on this path.
LOWER PALAEOZOIC SANDSTONE DEBITAGE FROM THE STONEHENGE LANDSCAPE
The petrography, geological age and distribution of the Lower Palaeozoic Sandstone debitage from the Stonehenge Landscape
by Rob Ixer, Peter Turner, Stewart Molyneux, and Richard Bevins
Wiltshire Archaeological & Natural History Magazine, vol. 110 (2017), pp. 1–16
Abstract:
The three major groups of debitage found in the Stonehenge Landscape are dolerites, rhyolitic tuffs (almost exclusively from Craig Rhosyfelin, now designated as Rhyolite Group A–C) and 'volcanics with sub-planar texture' now designated as Volcanic Group A and Volcanic Group B. The only other significant debitage group, but only accounting for about 5% by number, is an indurated sandstone now called the Lower Palaeozoic Sandstone. The Lower Palaeozoic Sandstone is a coherent lithological group with a slight metamorphic fabric and is a fine-grained feldspathic sandstone with characteristic dark, mudstone intraclasts. Palynological (acritarch) dating of the sandstone suggests that it is Late Ordovician or younger whilst the petrography suggests that it is older and more deformed than the Devonian (ORS) sandstones exposed in South Wales. Spatially, as with all the major debitage groups, the Lower Palaeozoic Sandstone is widely and randomly distributed throughout the Stonehenge Landscape; temporally, almost none of the debitage has a secure Neolithic context but some may have later Roman associations. The debitage cannot be matched to any above-ground Stonehenge orthostat but may be from one or two buried and, as yet, unsampled stumps. The lithology is believed to be from an unrecognised Ordovician (or less likely Silurian) source to the north or northeast of the Preseli Hills. Although there has been confusion within the archaeological literature between the 'Devonian' Altar Stone, Lower Old Red Sandstone (Devonian) Cosheston Group sandstone and the Lower Palaeozoic Sandstone, all three are very different lithologies with separate geographical origins.
by Rob Ixer, Peter Turner, Stewart Molyneux, and Richard Bevins
Wiltshire Archaeological & Natural History Magazine, vol. 110 (2017), pp. 1–16
Abstract:
The three major groups of debitage found in the Stonehenge Landscape are dolerites, rhyolitic tuffs (almost exclusively from Craig Rhosyfelin, now designated as Rhyolite Group A–C) and 'volcanics with sub-planar texture' now designated as Volcanic Group A and Volcanic Group B. The only other significant debitage group, but only accounting for about 5% by number, is an indurated sandstone now called the Lower Palaeozoic Sandstone. The Lower Palaeozoic Sandstone is a coherent lithological group with a slight metamorphic fabric and is a fine-grained feldspathic sandstone with characteristic dark, mudstone intraclasts. Palynological (acritarch) dating of the sandstone suggests that it is Late Ordovician or younger whilst the petrography suggests that it is older and more deformed than the Devonian (ORS) sandstones exposed in South Wales. Spatially, as with all the major debitage groups, the Lower Palaeozoic Sandstone is widely and randomly distributed throughout the Stonehenge Landscape; temporally, almost none of the debitage has a secure Neolithic context but some may have later Roman associations. The debitage cannot be matched to any above-ground Stonehenge orthostat but may be from one or two buried and, as yet, unsampled stumps. The lithology is believed to be from an unrecognised Ordovician (or less likely Silurian) source to the north or northeast of the Preseli Hills. Although there has been confusion within the archaeological literature between the 'Devonian' Altar Stone, Lower Old Red Sandstone (Devonian) Cosheston Group sandstone and the Lower Palaeozoic Sandstone, all three are very different lithologies with separate geographical origins.
Friday, 17 March 2017
Stonehenge Ticket Prices Up At Three Times The Inflation Rate, Again.
These are the new online prices for tickets to Stonehenge You will be encouraged to add another 10% or so as a Gift Aid contribution. Turning up at the site without tickets you will be charged more for the tickets, about another £1 a person.
The price to rent an audio guide increased in 2016 from £2 to £3 - the tour can be downloaded for free from Apple App or Google Play Stores and then played on your own device.
|
|
The average increase in price is 6.58% this year
The Consumer Prices Index increase for the year to February 2016 was 0.3% from then to Feb 2017 was 1.8%
Monday, 13 March 2017
English Heritage Plans to Block Historic Path at Stonehenge - Update
31 JULY UPDATE - the threat of the fence move and change has been averted
RE: P00557101 SVEP works Stonehenge variation at bus drop off point 17 01217 VAR HE planning advice
The planning agent has confirmed the following:
Historic England comments – I confirm that the existing post and wire fence between the southern platform and the monument field to the south is to be retained as a post and wire fence.
WHS Officer comments – I confirm that the proposed movable tensile barrier system would be of similar design to the existing barriers currently in use around the bus turnaround areas.
Lucy Minting
Senior Planning Officer
In November 2016 I reported on English Heritage's plans and how they block the historic footpath promised on the route of the A344. http://www.sarsen.org/2016/11/english-heritage-plans-to-block.html
In February 2017 English Heritage have gone back to Wiltshire Council with new plans for a variation on their plans for an improved Visitor Transit System and have kept, with small variation the plan to block the footpath.
This time not only have I objected* for the reasons below but so have Historic England
Historic England Advice
These proposed variations to planning consent 16/03988/FUL are largely acceptable with one exception. The proposal to vary the previously agreed post and wire fence on the south side of the Stonehenge-end visitor pick up/drop off would result in an adverse visual impact to views across this part of the WHS, including views towards Stonehenge.
Recommendation
Historic England has concerns regarding the application on heritage grounds.
We consider that the proposed variation to fencing at this location will have an adverse visual impact on this part of the WHS and in certain views towards Stonehenge. This would be contrary to the previously agreed principles of the Stonehenge Environmental Improvements Project (SEIP) and the Stonehenge Visitor Enhancement Project (SVEP) to minimise or remove visible infrastructure from the landscape. These principles are enshrined within the 2015 Stonehenge and Avebury WHS Management Plan, and whilst at face value a very minor issue, the proposed fence variation is in such a sensitive location as to run counter to the guidance in NPPF pargaraph 137 that new development within WHSs should be supported where it enhances or better reveals significance. A post and rail fence would not achieve this.
The background: English Heritage has failed to open the permissive path they are obliged to provide on the route of the old A344, which should have been done by summer 2016. They claim the grass surface won't be ready until 2017. It is no secret they wish they didn't have to provide this path despite it being an important historic route which will boost the sustainability and local access of the site.
The latest impediment to the permissive path is hidden away in a document where they are asking Wiltshire Council to approve a variation in how the Visitor Transit System works at the monument.
One small detail is they want to move a stock fence 3m from the field edge onto the route of the A344. There is no practical reason to do so apart from narrowing the A344 route. Leaving the fence where it is and using crowd barriers is more sensible if they want to corral the visitors.
But if they do erect the stock fence there then, as they point out, there is no room for pedestrians to walk along the route of the A344.
RE: P00557101 SVEP works Stonehenge variation at bus drop off point 17 01217 VAR HE planning advice
The planning agent has confirmed the following:
Historic England comments – I confirm that the existing post and wire fence between the southern platform and the monument field to the south is to be retained as a post and wire fence.
WHS Officer comments – I confirm that the proposed movable tensile barrier system would be of similar design to the existing barriers currently in use around the bus turnaround areas.
Lucy Minting
Senior Planning Officer
In November 2016 I reported on English Heritage's plans and how they block the historic footpath promised on the route of the A344. http://www.sarsen.org/2016/11/english-heritage-plans-to-block.html
In February 2017 English Heritage have gone back to Wiltshire Council with new plans for a variation on their plans for an improved Visitor Transit System and have kept, with small variation the plan to block the footpath.
This time not only have I objected* for the reasons below but so have Historic England
Historic England Advice
These proposed variations to planning consent 16/03988/FUL are largely acceptable with one exception. The proposal to vary the previously agreed post and wire fence on the south side of the Stonehenge-end visitor pick up/drop off would result in an adverse visual impact to views across this part of the WHS, including views towards Stonehenge.
Recommendation
Historic England has concerns regarding the application on heritage grounds.
We consider that the proposed variation to fencing at this location will have an adverse visual impact on this part of the WHS and in certain views towards Stonehenge. This would be contrary to the previously agreed principles of the Stonehenge Environmental Improvements Project (SEIP) and the Stonehenge Visitor Enhancement Project (SVEP) to minimise or remove visible infrastructure from the landscape. These principles are enshrined within the 2015 Stonehenge and Avebury WHS Management Plan, and whilst at face value a very minor issue, the proposed fence variation is in such a sensitive location as to run counter to the guidance in NPPF pargaraph 137 that new development within WHSs should be supported where it enhances or better reveals significance. A post and rail fence would not achieve this.
The background: English Heritage has failed to open the permissive path they are obliged to provide on the route of the old A344, which should have been done by summer 2016. They claim the grass surface won't be ready until 2017. It is no secret they wish they didn't have to provide this path despite it being an important historic route which will boost the sustainability and local access of the site.
The latest impediment to the permissive path is hidden away in a document where they are asking Wiltshire Council to approve a variation in how the Visitor Transit System works at the monument.
One small detail is they want to move a stock fence 3m from the field edge onto the route of the A344. There is no practical reason to do so apart from narrowing the A344 route. Leaving the fence where it is and using crowd barriers is more sensible if they want to corral the visitors.
But if they do erect the stock fence there then, as they point out, there is no room for pedestrians to walk along the route of the A344.
Click plans to enlarge
Quote from the planning document:
As a result of this layout people visiting the stones on foot along the A344 will cross Byway 12 and then cross the entrance to the bus turning circle east of Byway 12 to access the monument field (see Appendix A). This is because there is not enough space on the southern VTS platform area to accommodate the loading of passengers on the bus and walkers coming from the west. Visitors wishing to walk back to the Visitor Centre will walk along the southern platform and then cross Byway 12 onto the A344 designated pedestrian route.
Planning Condition these revised plans are designed to meet:
Planning Condition 4 states:
‘Notwithstanding the submitted drawings showing the proposals for directing pedestrian arrivals in the vicinity of the A344 junction with Byway 12, prior to the commencement of the development hereby approved further details shall be submitted to and approved in writing by the Local Planning Authority demonstrating how pedestrians using the signed and lined route on the southern side of the A344 can access the Stones without having to cross the A344 or to walk within the route used by the Visitor Transit System to the east side of Byway 12. The approved details shall be implemented before the proposed bus turning arrangements are brought into effect.
Note the requirement is that visitors should not have to walk within the route and yet the plans require them to do so purely because the fence move makes the path too narrow. If the fence isn't moved then there is no problem and the planning condition could be met.
The only logical purpose of the fence move is therefore to prevent the permissive path being established. Wiltshire Council must not fail in their duty and approve these plans.
The suggestion the fenced off area is to allow the establishment of "swathes of meadow planting helps enhance the naturalistic feel of the space whilst helping integrate the facilities into the natural landscape." doesn't make sense as the area will be in a sheep field and English Heritage have shown us with the rest of the A344 it takes many years to establish such grass and it mustn't be trodden on during the establishment phase. A temporary barrier and leaving the stock fence where it is would be more suited for grass establishment.
To comment by email click Wiltshire Council
* My objection email:
The suggestion the fenced off area is to allow the establishment of "swathes of meadow planting helps enhance the naturalistic feel of the space whilst helping integrate the facilities into the natural landscape." doesn't make sense as the area will be in a sheep field and English Heritage have shown us with the rest of the A344 it takes many years to establish such grass and it mustn't be trodden on during the establishment phase. A temporary barrier and leaving the stock fence where it is would be more suited for grass establishment.
To comment by email click Wiltshire Council
* My objection email:
The connected application 17/01217/VAR has plans which show their intended solution to the Condition and whilst they are an improvement on previous plans they still fail to meet the requirements of the planning committee.
To recite: “Notwithstanding the submitted drawings showing the proposals for directing pedestrian arrivals in the vicinity of the A344 junction with Byway 12, prior to the commencement of the development hereby approved further details shall be submitted to and approved in writing by the Local Planning Authority demonstrating how pedestrians using the signed and lined route on the southern side of the A344 can access the Stones without having to cross the A344 or to walk within the route used by the Visitor Transit System to the east side of Byway 12. The approved details shall be implemented before the proposed bus turning arrangements are brought into effect."
The new plan whilst retaining the existing gate to the south of the road, which is an improvement, still has a crossing area just to the east of the gates within the route used by the Visitor Transit System. The need for this crossing, which is contrary to the planning instructions, is purely because of the bottleneck introduced into the area by the erection of the new stock fence 3m further north east of the existing fence. If this fence is not moved but just renewed in its existing position and, as proposed, the existing gate is retained then there is no need for the crossing area. It is a simple fix that would allow the proposed plans to meet the requirements of the planning condition.
Sunday, 12 March 2017
The Social Archaeology of Megalithic Monuments - Colin Renfrew
The change from simple tombs to elaborate henges in the Neolithic period of western Europe appears to have coincided with the rise of centralized political control...
Link - The Social Archaeology of Megalithic Monuments
Colin Renfrew
Publication Date: 1983
Publication Name: Scientific American
Link - The Social Archaeology of Megalithic Monuments
Colin Renfrew
Publication Date: 1983
Publication Name: Scientific American
Tuesday, 7 March 2017
Brer Rabbit and the Tunnel - a modern fable
Department of Transport
Confidential briefing note
A303 upgrade
- We promised the South West Lib Dems a fast A303 to keep them happy in the last parliament – most of them lost their seats but the deal can’t be unravelled as new Tories down there need to show we care for the peninsular.
- Southampton – Salisbury – M3 and M4 these routes need upgrading for trade.
- Stonehenge is the blocking point on the A303.
- Divert the A303 nearer to Salisbury to pick up traffic as above cuts the cost of Salisbury road upgrades and it is cheaper than keeping the beardies happy around Stonehenge.
- English Heritage and National Trust desperate to keep main road near Stonehenge for revenue reasons – “Tourists won’t leave the major road to visit a bunch of rocks”.
- Operation “Brer Rabbit” – put forward a Stonehenge Tunnel Scheme that we claim we desperately want will keep EH and NT onside. But make it outrageous to upset beardies by blocking out Winter Solstice view – subtle enough to get past the headquarter wonks at EH and NT but will be picked up as we consult (we can make sure of that.)
- "Very sorry, we tried" to EH & NT. We get cheaper road where we want it, and any complaints as we put new road plans in we can blame the Stonehenge crowd.
- Result: Highways England happy, Road transport lobby happy, Road blockers happy, South West happy, Southampton and Salisbury happy, Treasury happy - just English Heritage will be unhappy but they can't say anything as they have to show they care more for the monuments than the cash.